Free Installation
Training Included
1-Year Warranty
Spare Parts PackageThe QTM10-15 Mobile Hydraulic Block Making Machine is the ultimate "Egg-laying" solution for large-scale block production without the overhead of pallets. Engineered by Dongyue Machinery Group, this machine moves across a concrete floor, molding blocks directly onto the ground and leaving them to cure in-situ. This revolutionary design eliminates 100% of pallet investment and complex stacking systems.
Equipped with a high-performance Hydraulic Driving System and an integrated steering mechanism, the QTM10-15 offers unmatched flexibility. It is the ideal choice for massive infrastructure projects, disaster relief rebuilding, and cost-conscious industrial manufacturers who need to scale production rapidly on minimal infrastructure.
Direct-on-floor molding saves tens of thousands of dollars in pallet procurement and replacement costs annually.
Combines heavy-duty vibration with hydraulic pressure to ensure mobile-produced blocks meet the same strength as stationary plants.
Discover how the QTM10-15 pallet-free system revolutionizes ROI for B2B block manufacturing.
| Technical Parameter | Value (QTM10-15) |
|---|---|
| Host Machine Power | 16 kW |
| Moulding Cycle | 10-15 Seconds |
| Operating Voltage | Supports 220V/380V/440V |
| Molding Type | Mobile Egg-laying / Pallet-free |
| Dimensions | 3150x1800x2400mm |
| Block Dimensions | Qty / Cycle | Estimated Output |
|---|---|---|
| Hollow Block (400x200x200) | 10 pcs | 14400-16800 pcs / 8h |
| Hollow Brick (400x150x200) | 14 pcs | 20160-23520 pcs / 8h |
| Hollow Brick (400x100x200) | 20 pcs | 28800-33600 pcs / 8h |
* Note: Capacity depends on floor flatness and operator speed. Please consult technical department for precise values.
For making 400*200*200, 8 inches hollow block , Varies by model: 2000-3,000 (small) / 5,000-15,000 (medium ) blocks/day.20000-35000 (High). We’ll match your target.
Standard blocks (hollow/solid/paving) + custom molds for your dimensions.we can send you block sample
Free for faulty parts (excluding wear from improper use).
4-5 (small) / 6-7 (large) staff. Training covers operation, maintenance, safety.
Concrete, fly ash, sand,stone powder etc. We adjust parameters for local materials.